STATUS OF JIM THORPE 903 BRIDGE PROJECT (August 23, 2015)

Update, Status of Bridge Work, Construction Status, SR903, Jim Thorpe, 8-23-2015 (9)Pictured are photos showing the current construction status of the new Route 903 Jim Thorpe Bridge, as of Sunday, August 23, 2015.
Contractors are well into the three-year $28 million project to replace the existing Route 903 Bridge with a new Route 903 Jim Thorpe Memorial Bridge. The new bridge is being built about 600-feet northwest of the current bridge and will connect North Street with US209.
The project involves the construction of a new 961-foot, four-span continuous steel plate girder bridge structure over the Lehigh River, Lehigh Canal, Reading Blue Mountain Northern Railroad and Norfolk Southern Railroad. It also includes the construction of three retaining walls, milling and paving of US209 (from about the intersection with Liberty Road to approximately 0.2 miles north of Packer Hill Road) and the removal of the existing Route 903 Bridge and other miscellaneous construction activities.

TamaquaArea.com Illustration/Image from Google Maps
TamaquaArea.com Illustration/Image from Google Maps

The project started February 10, 2014 and is estimated to be completed by July 2017. Contactor for the $28,183,312.02 project is Allan A. Myers, LP of Worcester PA.

Click HERE for photos courtesy of John Bieniek on Facebook.

Click HERE to view past photos.



TamaquaArea.com Video:

TamaquaArea.com Photos:

Below photos courtesy John Bienieck:

One comment

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s